Reconcile project documents from pre‑bid to completion.
From takeoff and estimating to change order management, IPSES reconciles plans, specifications, schedules and project records. Keep scope, cost and schedule aligned from pre-bid through project completion.
F-001AHUs released 14 weeks after order-by date$1.24M+14 d
F-002Level 4 medical gas absent from schedule$862K+9 d
F-009CDPHE approval not modeled as a predecessor$415K+30 d
F-004Elevators have no predecessor to shaft completion$445K+22 d
F-003Podium and tower fit-out can run concurrently$610K−16 d
At risk$2.96M 75 d
Recoverable$610K 16 d
Scope, cost and schedule drift when documents don't agree.
P-402
Scope you never priced
Sheet P-402, rev 4
A med gas manifold on sheet P-402 that never made it into the estimate is not a scheduling error. It's a six-figure gap between the documents and the price, discovered too late to fix cheaply.
+14 wk
Lead times that don't reconcile
Spec 23 73 13, MEP-2210
A 38-week AHU released 14 weeks late doesn't fail today. It fails eighteen months from now, on the critical path, when nobody can recover it.
17 d
Money left on the table
ENV-2900 to INT-3000
Idle gaps, duplicate mobilizations and changed scope can be missed as a job evolves. Reconcile the record before those gaps affect cost, completion or a change order.
Start with the documents you already have.
Plans, specifications, addenda, takeoffs and estimates, schedules, field reports and change orders.
What you upload
Drawing set, 100% CD842 pages
Project manualDivisions 00 to 48
Addenda 01 to 0674 pages
Owner contract & exhibits214 pages
Quantity dataBIM r12
What it is checked against
Baseline scheduleRev. C, 1,240 activities
EstimateCost breakdown
Works with the tools your project already runs on.
Oracle Primavera P6Schedule
Microsoft ProjectSchedule
ProcoreProject data
AutodeskDesign & docs
BluebeamDocument review
ClaudeFrontier model
GPTFrontier model
Custom API integrationsYour systems of record
MCP integrationsAgent-native access
A side-by-side review that runs in hours, not weeks.
Compare what the contract documents require with what the takeoff, estimate, schedule and field records show. Trace changes back to their source as the project progresses.
Every link is checked. The ones that don't hold become findings. See the methodology
Every gap is margin you could lose or revenue you could leave behind.
Missing scope, quantity and cost inconsistencies, sequencing conflicts, lead-time risk and change order exposure—with source evidence for your team to review.
What it could cost you
Negative risk
Missed scope that erodes margin or budget after award
Sequencing that cannot physically be built as drawn
Long-lead equipment that lands on the critical path
Inspection, permit and commissioning gaps that stall turnover
Float and logic defects that get the schedule rejected outright
What it could earn you
Positive opportunity
Idle time between phases that compresses with no added risk
Procurement resequencing that saves days and locks price holds
Duplicate mobilizations that collapse into one
Prefabrication alternates the specification already permits
Change-driven scope the plan never reconciled into dates or dollars
Averages across reviewed contracts, per $100M
$2.6M
Margin at risk surfaced, per $100M of contract value
$1.1M
Recoverable revenue & efficiency identified
20+
Clarifications resolved before submission
12
Schedule days of exposure found on the critical path
Indicative averages. Every contract and project varies in risk and revenue.
Less document chasing. More time for project decisions.
From the first takeoff to the final change order, your team needs consistent documents. IPSES cross-checks the records you choose and returns findings with source evidence, so estimators, schedulers and project managers can review scope, cost and schedule impacts throughout the job.
Side-by-side review
Documents on one side, schedule on the other, with every link traced.
Highest-level security
Encryption in transit and at rest, tenant isolation, SSO and full audit logging.
Choose the checks and findings that matter to your team. Use the source-linked review to support bid decisions, project controls and change order management.
A global engineering firm cut 274 billed schedule hours to about 9. Read the case study
Representative findingCritical
Air handling units released 14 weeks after required order-by date
Source
Spec 23 73 13, p. 7, §2.1.B
Affected activity
MEP-2210, AHU Submittal & Fabrication Release
Financial impact
$1,240,000
Schedule impact
14 days, critical path
Confidence
94%
Recommended action: pull MEP-2210 forward to Nov-2026, add an early-release procurement activity, and confirm the 38-week lead time in writing before submission.
First project free, so you can see what you've been missing.
Bring a project at any stage—from pre-bid takeoff and estimating to active construction or closeout. We'll review the documents you choose and walk your team through the findings, supporting evidence and potential cost and schedule impacts.