Skip to content

Reconcile project documents from pre‑bid to completion.

From takeoff and estimating to change order management, IPSES reconciles plans, specifications, schedules and project records. Keep scope, cost and schedule aligned from pre-bid through project completion.

First project free. Private by default.

Northstar Medical Center, Phase IISample data
Review complete5 findings
  • F-001AHUs released 14 weeks after order-by date$1.24M+14 d
  • F-002Level 4 medical gas absent from schedule$862K+9 d
  • F-009CDPHE approval not modeled as a predecessor$415K+30 d
  • F-004Elevators have no predecessor to shaft completion$445K+22 d
  • F-003Podium and tower fit-out can run concurrently$610K−16 d
At risk$2.96M 75 d
Recoverable$610K 16 d

Scope, cost and schedule drift when documents don't agree.

  1. P-402

    Scope you never priced

    Sheet P-402, rev 4

    A med gas manifold on sheet P-402 that never made it into the estimate is not a scheduling error. It's a six-figure gap between the documents and the price, discovered too late to fix cheaply.

  2. +14 wk

    Lead times that don't reconcile

    Spec 23 73 13, MEP-2210

    A 38-week AHU released 14 weeks late doesn't fail today. It fails eighteen months from now, on the critical path, when nobody can recover it.

  3. 17 d

    Money left on the table

    ENV-2900 to INT-3000

    Idle gaps, duplicate mobilizations and changed scope can be missed as a job evolves. Reconcile the record before those gaps affect cost, completion or a change order.

Start with the documents you already have.

Plans, specifications, addenda, takeoffs and estimates, schedules, field reports and change orders.

What you upload

  • Drawing set, 100% CD842 pages
  • Project manualDivisions 00 to 48
  • Addenda 01 to 0674 pages
  • Owner contract & exhibits214 pages
  • Quantity dataBIM r12

What it is checked against

  • Baseline scheduleRev. C, 1,240 activities
  • EstimateCost breakdown

Works with the tools your project already runs on.

  • Oracle Primavera P6Schedule
  • Microsoft ProjectSchedule
  • ProcoreProject data
  • AutodeskDesign & docs
  • BluebeamDocument review
  • ClaudeFrontier model
  • GPTFrontier model
  • Custom API integrationsYour systems of record
  • MCP integrationsAgent-native access

A side-by-side review that runs in hours, not weeks.

Compare what the contract documents require with what the takeoff, estimate, schedule and field records show. Trace changes back to their source as the project progresses.

Drawing set, 100% CD842 pagesProject manualDivisions 00 to 48Addenda 01 to 0674 pagesOwner contract & exhibits214 pagesQuantity dataBIM r12Baseline scheduleRev. C, 1,240 activitiesEstimateCost breakdown

Every link is checked. The ones that don't hold become findings. See the methodology

Every gap is margin you could lose or revenue you could leave behind.

Missing scope, quantity and cost inconsistencies, sequencing conflicts, lead-time risk and change order exposure—with source evidence for your team to review.

What it could cost you

Negative risk

  • Missed scope that erodes margin or budget after award
  • Sequencing that cannot physically be built as drawn
  • Long-lead equipment that lands on the critical path
  • Inspection, permit and commissioning gaps that stall turnover
  • Float and logic defects that get the schedule rejected outright

What it could earn you

Positive opportunity

  • Idle time between phases that compresses with no added risk
  • Procurement resequencing that saves days and locks price holds
  • Duplicate mobilizations that collapse into one
  • Prefabrication alternates the specification already permits
  • Change-driven scope the plan never reconciled into dates or dollars

Averages across reviewed contracts, per $100M

  • $2.6M

    Margin at risk surfaced, per $100M of contract value

  • $1.1M

    Recoverable revenue & efficiency identified

  • 20+

    Clarifications resolved before submission

  • 12

    Schedule days of exposure found on the critical path

Indicative averages. Every contract and project varies in risk and revenue.

Less document chasing. More time for project decisions.

From the first takeoff to the final change order, your team needs consistent documents. IPSES cross-checks the records you choose and returns findings with source evidence, so estimators, schedulers and project managers can review scope, cost and schedule impacts throughout the job.

  • Side-by-side review

    Documents on one side, schedule on the other, with every link traced.

  • Highest-level security

    Encryption in transit and at rest, tenant isolation, SSO and full audit logging.

Choose the checks and findings that matter to your team. Use the source-linked review to support bid decisions, project controls and change order management.

A global engineering firm cut 274 billed schedule hours to about 9. Read the case study

Representative findingCritical

Air handling units released 14 weeks after required order-by date

Source
Spec 23 73 13, p. 7, §2.1.B
Affected activity
MEP-2210, AHU Submittal & Fabrication Release
Financial impact
$1,240,000
Schedule impact
14 days, critical path
Confidence
94%

Recommended action: pull MEP-2210 forward to Nov-2026, add an early-release procurement activity, and confirm the 38-week lead time in writing before submission.

First project free, so you can see what you've been missing.

Bring a project at any stage—from pre-bid takeoff and estimating to active construction or closeout. We'll review the documents you choose and walk your team through the findings, supporting evidence and potential cost and schedule impacts.