Who we serve
Two very different exposures. One reconciliation.
Contractors carry schedule acceptance and GMP risk. Subcontractors carry scope and production risk. IPSES runs the same engine and reports it in the terms that matter to you.
General contractors & CM at Risk
You own the schedule the owner accepts, the GMP you signed, and every interface between forty trade partners. IPSES reconciles all three against the documents before the schedule leaves your office.
Protect schedule acceptance
Owner scheduling specifications reject on float thresholds, open-ended activities and orphan logic. IPSES clears those defects before the first submission, avoiding resubmission cycles that burn weeks of preconstruction staff time.
Defend the GMP
Scope that appears in the drawings but not in your buyout becomes your cost. The review reconciles model quantities and specification requirements against the estimate WBS and flags the gaps while they're still negotiable.
See the real critical path
Missing predecessors hide exposure. Once logic is corrected, IPSES shows which chains actually govern completion and where single points of failure sit with no mitigation.
De-risk trade interfaces
Handoff gaps, crew stacking and integration tests that nobody scheduled are the most common source of late-stage acceleration. Each is surfaced with the activity IDs involved.
Give the scheduler leverage
Your scheduler stops cross-checking sheet numbers and starts making sequencing decisions. Same headcount, materially better schedule.