Two very different exposures. One reconciliation.
Contractors carry schedule acceptance and GMP risk. Subcontractors carry scope and production risk. IPSES runs the same engine and reports it in the terms that matter to you.
Subcontractors & specialty trades
Your exposure is concentrated: one scope, tight margin, and a schedule someone else wrote. IPSES checks that schedule against the plans and specs that define your work — and finds the revenue you're entitled to.
Never absorb missed scope
If the specification and drawings require it and your bid didn't carry it, you find out before you sign — not after the first pay application.
Stop taking someone else's duration
Durations below regional production rates get flagged as outliers with the quantity basis attached, so you can push back with numbers instead of instinct.
Protect your lead times
Long-lead equipment scheduled to be released after the order-by date is your delay claim waiting to happen. IPSES shows the gap in weeks and dollars.
Find the revenue you're leaving behind
Addenda scope not reflected in the schedule, permitted prefabrication alternates, and duplicate mobilizations you're absorbing all become priced line items.
Submit with evidence
Every clarification you raise cites a sheet, a section and a page. That's the difference between a request and an argument.